AKTUBINSK POWER PLANT

AKTUBINSK POWER PLANT

 
Owner Ministry of Energy
Place AKTUBINSK / Kazakhstan
Dates 1995--

The works mainly included design and construction of; Technical Buildings, including; Gas Turbine House, Boiler House, Steam Turbine, Control Room together dating universal contact us and Power Control Center, By-pass stacks,220 KV and 500 KV open Switchgear, Water Demineralization Plant and Water Tanks, Cooling Water intake and 4.5 km water pipe-line, singles parties in chicago Complete infrastructure and Evaporation ponds, Diesel and Fuel-oil Tanks, Fuel-oil pump house and system, Gas Pressure Reducing Station and Gas pipe-lines, Natural i kissed dating goodbye torrent Draught, Wet Cooling Towers, Highway connection and 4.5 intelligent free online dating km railway connection, Administration, and Social Buildings,